• We are STAs
    • Daniela Caballero
    • Leilani Cabello
    • Lorena Chiles
    • Marissa Devivar
    • Luisa Matzner
    • De’sha Bass-McClellan
    • Adrian McKee
    • Thang Truong
    • Carrie Wang
  • We were STAs
  • STA Presentation
    • STA Presentation 2017
    • STA Presentation 2016
  • Testimonials
  • Resources
  • Home

STA Blog

Project Estimation: Scanning

March 16, 2020 By Abriella Corker

PROJECT ESTIMATION: SCANNING

I have added a new section in the table of contents for project estimations. We finally quantified how long each type of scanning material takes so that we can give more accurate time frames and billings to clients. Before it was more ambiguous on long a total project can take where we would overestimate by a few hours to be safe on billing with the client. Now with this, an STA handed a scanning project will be able to look over all the contents of what they need to scan and come up with a more accurate time frame. This will also allow the client to see a more itemized break down of the bill with the content and how long each one takes to scan.

Filed Under: 2019 Fall-Winter | Spring-Summer 2020

link to LAITS home page

Video STA Home

© 2023 Liberal Arts Instructional Technology Services | Production Credits